Prevents scale buildup and algae by effectively changing out the cooler water. Designed to eliminate approximately 90% of mineral buildup caused by evaporation. Heavy duty tee will not corrode and...
Designed to prevent scale build-up in evaporative coolers by continuously changing the water in the cooler. Easily connects to existing pump hose with included bleed tee connector. Replaces Champion...
Complete Pad Frame Assembly Fits: Cool Tool CTV2, CTV21,CTV4600/01 Pad frame Assembly includes aspen pad, and pad retainer wire. Non-stock item. Please allow 7-10 business days for lead time from...